NEWS

30
Sep

Kynningsrud Prefab grows

Kynningsrud Prefab in Norway and Sweden is growing, and the need for overall functions increases. HSE manager for Division Precast To strengthen the leadership role within HSE and Division Precast Heine Lien gets a superior responsibility. Heine has extensive experience after many years as head of HSE in Kynningsrud. He also continues in his position as head of HSE Kynningsrud

Read more

7
Sep

Mobile office containers streamline construction sites

An assembly leader’s workday is increasingly filled with ever more office work in terms of reporting and documentation.  Therefore, Kynningsrud Prefab has now invested in separate and mobile office containers. Mobile office containers The 10 foot large office containers is lifted upwards in the building as the assembly process is progressing, and is thus available entirely in assembly front. The

Read more

15
Apr

Prefab AB environmentally certified in 2016

Even this year Kynningsrud Prefab AB passed the environmental requirements based on the ISO14001 standard and thus has an approved Environmental Diploma for in 2016. – Kynningsrud Prefab is now working hard on developing the conditions to be certified according to ISO14001 standard, and we hope that we will get there next year, says HSE coordinator Lena Larsson.   

29
Mar

The assembly has started at Mölndal Galleria

Briefly, the project consists of two parts on each side of Mölndal bridge. Both buildings consists of business premises on the ground floor, parking garage in four levels and on top of this   eight floors of housing will be built.  Parking houses will connected by a new bridge over  Mölndal bridge. – Actually, it is nothing special about the installation

Read more

9
Mar

Kynningsrud becomes mentor company

This cooperation will continue for two years and the idea is that students should use Kynningsrud in its curriculum in order to create a local reality in their school work. Visited the mentor company It was a whole bus load of total 41 students and three teachers who visited the company at this initial meeting, where they were given a

Read more

20
Jan

Additional facade walls order to our record project!

In August 2015, the deal was made that Kynningsrud Prefab will deliver the concrete frame to Mölndal Galleria, an order that almost touches the entire SEK 110 million. We have now received an extra order for facade walls and will deliver approximately 9400 sqm additionally. Different types of facade walls – It is very satisfying to even get the opportunity

Read more

13
Oct

Foundations for «A9 Diagonale» in Oslo

A9 Diagonale is situated between Dronning Eufemia Street and Operagata in Oslo. The entire project will include approximately 400 student apartments, 14,000 sqm offices and 4000 sqm business / restaurant premises at street level. The whole is divided between two building bodies bound together by a common basement, that eventually will be attached to the basement of the A9 Deichmanske

Read more

29
Sep

Nordic Crane disassembles factory

The 50 % Kynningsrud owned company Nordic Crane Øst is a part of the whole process and has at most been at site with eight mobile cranes and eight semis simultaneously. The work takes place on everything from open spaces to alleyways. There are long pipes to be dismantled and piping to be moved, before loading them aboard the boat

Read more

21
Sep

Strengthening the Project Division

Project Manager Mikael Kihlberg started his position as a Project Manager at September 7. He was most recently at UFAB, one of the Mattsson companies here in Uddevalla, where he held various positions during the 31 years he was employed. With Michael’s expertise in steel, he will suit the department well. Michael lives in Munkedal with his wife and three

Read more

26
Aug

A record breaking order for Precast

– It is very gratifying to have developed this frame solution with NCC says Niclas Brav, Sales Engineer at Kynningsrud Prefab AB. – Efforts to reach a well-functioning and efficient body has taken many months and it’s very satisfying to finally sign the contract, continues Brav. The assembly of the frame will commence in early 2016 and will continue throughout

Read more